It varies significantly based on the scope of work. A straightforward floor joist sistering project in a rowhouse basement might take one to two days of on-site work. A load-bearing wall removal with beam installation typically takes two to five days including temporary shoring setup, demolition, beam installation, and post-work patching. Larger structural projects — foundation reinforcement, multi-floor structural work, or commercial structural modifications — are scoped individually. Permit timelines with the City of Philadelphia add lead time before on-site work can begin; NK Construction And Design accounts for this in every project schedule we provide.