The structural portion of a standard single-story load-bearing wall removal and beam installation in a Philadelphia home typically takes one to three days. However, the total project timeline — including permits, L&I approval, and finish work — generally runs one to three weeks. Projects involving utility rerouting, multi-story walls, or significant finishing work take longer. NK Construction And Design gives every client a realistic project timeline during the consultation and keeps you updated at every stage.
How long does wall removal and beam installation take?
< 1 min read